We were recently contracted to carry out works at a large food manufacturing facility in Lithgow. These works consisted of removal of the existing floor, excavation of the concrete slab and installation of new concrete and epoxy flooring. Whilst being a huge task to take on, the finished result was very rewarding.
Click on the image below to view a pictorial diary of these works. Enjoy!