Packing Hall
Client:
White Prince Mushrooms
Location:
Windsor, NSW
Scope Overview
Prepared the existing floor, and installed new flooring, joints and coving.
Project Description
White Prince Mushrooms reached out to Allied Finishes to see if we could complete a large area of flooring over a 12 hr period. The existing floor was very damaged, so the project involved removing all existing flooring and installing a fast-curing antimicrobial floor.