Packing Hall

Client:

White Prince Mushrooms

Location:

Windsor, NSW

Scope Overview

Prepared the existing floor, and installed new flooring, joints and coving.

Project Description

White Prince Mushrooms reached out to Allied Finishes to see if we could complete a large area of flooring over a 12 hr period. The existing floor was very damaged, so the project involved removing all existing flooring and installing a fast-curing antimicrobial floor.

Recent Case Studies