Project

Installed our SteriFloor Stärke flooring solution in multiple areas.

What We Did

Removed all existing flooring, and installed our SteriFloor Stärke flooring solution to multiple areas.

Client

Large Commercial Bakery

Timeline

This flooring project was completed over a weekend shutdown.

Project Information

This large commercial bakery experienced high traffic volumes, and the existing floor was failing. A 6mm, hard wearing flooring solution was required to stand up to high volumes of foot and forklift traffic.

With machinery being installed shortly after the floor, the timeframe for completion was short, but our installation team was given multiple weekends to complete the project.

Challenges

This project involved multiple aspects which all had to be completed prior to manufacturing starting on Monday. However, like always, our site project team completed this project with 100% success.

Results

The client was very impressed with the final outcome – the project was completed with minimal disruption to production, and completed prior to the machinery being installed, as planned.

I highly recommend Allied Finishes. They offer excellent customer service, and the quality of their work is first class.

Michael Slater, Casella Family Brands