Large Chemical Storage Tanks
Client:
Kraft Heinz, Australia
Location:
Wagga Wagga, NSW
Scope Overview
Flooring, Joints, Bunding
Project Description
This project involved small areas around large chemical storage tanks. A PUC floor layer was required in this area so that the concrete would not erode with any chemical leakage. In some areas, bunding was required, where our bunding solution was installed to ensure maximum protection of the chemical storage area.