Project
Created a seamless flooring solution, with line marking appropriate to the company’s traffic management plan.
What We Did
Removed all existing flooring, and installed a slip resistant, chemical resistant floor to a Brew Room.
Client
Timeline
This project was completed over a 24hr period.
Project Information
Goodman Fielder had a high slip hazard in their Brew Room, so Allied Finishes were called in to deliver our expert opinion on how to rectify it. Our technical specifications team developed the best solution for this challenge. After removing the existing vinyl surface, we installed a heavy-duty polyurethane cement surface, and incorporated a heavy non-slip material.
Our installed floor was 100% food-safe, slip resistant, chemical resistant, and provided long term durability.
Challenges
Results
As an ongoing client of Allied Finishes, Goodman Fielder were very pleased with the result of the floor.
They were particularly pleased that they could walk on the floor 6am Monday, after our team finished onsite at 12am!