Removed existing failing floor, prepared substrate thoroughly, and applied our SteriFlake flooring solution to the area.

Project Description

The client was after a floor that provided slip resistance but did not trap flour particles. A typical slip resistant floor would not provide this, so we installed our flake flooring solution, providing an element of grip, but does not allow particles to get trapped in the grooves of the floor.