Large Flour Mill Project
Client:
Manildra Flour Mill
Location:
Narrandera, NSW
Scope Overview
Removed existing failing floor, prepared substrate thoroughly, and applied our SteriFlake flooring solution to the area.
Project Description
The client was after a floor that provided slip resistance but did not trap flour particles. A typical slip resistant floor would not provide this, so we installed our flake flooring solution, providing an element of grip, but does not allow particles to get trapped in the grooves of the floor.
Download Case Study