Project

Installed our SteriFloor Beschützen flooring solution in this mid-sized commercial kitchen.

What We Did

Removed all existing flooring, and installed a slip resistant floor with falls to drains.

Client

Commercial Kitchen, Lithgow.

Timeline

This project was completed over a 24hr period.

Project Information

This commercial kitchen was being upgraded to provide staff and visitors a better experience. Our team customised our SteriFloor Beschützen system so the area was non-slip, durable and long-lasting.

Our installed floor was 100% food-safe, slip resistant, chemical resistant, and provided long term durability.

Challenges

The project timeline proved difficult on this project, as a large area had to be completed in a short amount of time. However, like always, our site project team completed this project with 100% success.

Results

As a local client of Allied Finishes, the client was very impressed with the floor and workmanship of our team.

They were particularly pleased that they could walk on the floor 6am Monday, after our team finished onsite at 12am!

I highly recommend Allied Finishes. They offer excellent customer service, and the quality of their work is first class.

Michael Slater, Casella Family Brands