Scope Overview
Removed existing flooring, installed new flooring, new ramps, coving and joints
Project Description
This large commercial bakery experienced high traffic volumes, and the existing floor was failing. A 6mm, hard wearing flooring solution was required to stand up to high volumes of foot and forklift traffic. With machinery being installed shortly after the floor, the timeframe for completion was short, but our installation team was given multiple weekends to complete the project.