Project
Create a flooring solution for a very busy abattoir with short shutdown periods.
What We Did
Remove all existing flooring, supplied and installed heavy non-slip flooring, coving and joints.
Client
Abattoir, Riverina Area
Timeline
This project was completed over a 24hr period.
Project Information
This client required a heavy non-slip flooring to eliminate the risk of slips, trips and falls in their production, packing and wash-down areas. All of the areas completed had constant foot and forklift traffic, along with a high volume of liquids on the floor.
The client was after a medium cream colour, to match their company colours.
Challenges
There was a lot of machinery that had to be worked around, but using our purpose-built tools, it enabled us to complete this project satisfactorily.
This project had a tight timeframe for the amount of work to be completed, but Allied Finishes found the perfect solution to meet this.
As aforementioned, the non-slip level required was very heavy, and Allied Finishes developed a solution to meet this need.
Results
The client was thoroughly satisfied with the project, and Allied Finishes was asked to complete more work after this.