Project

Create a flooring solution for a very busy abattoir with short shutdown periods.

What We Did

Remove all existing flooring, supplied and installed heavy non-slip flooring, coving and joints.

Client

Abattoir, Riverina Area

Timeline

This project was completed over a 24hr period.

Project Information

This client required a heavy non-slip flooring to eliminate the risk of slips, trips and falls in their production, packing and wash-down areas. All of the areas completed had constant foot and forklift traffic, along with a high volume of liquids on the floor.

The client was after a medium cream colour, to match their company colours.

Challenges

There was a lot of machinery that had to be worked around, but using our purpose-built tools, it enabled us to complete this project satisfactorily.
This project had a tight timeframe for the amount of work to be completed, but Allied Finishes found the perfect solution to meet this.
As aforementioned, the non-slip level required was very heavy, and Allied Finishes developed a solution to meet this need.

Results

The client was thoroughly satisfied with the project, and Allied Finishes was asked to complete more work after this.

We are very happy with the finished floor provided by Allied Finishes. We were particularly pleased with the thorough nature of Troy's work (Operations Manager) ensuring every square metre of the floor was at the very highest level.

Frank Coorey, Managing Director / My Chef Cuisine

Schedule A Meeting With An Expert